Construction Stage Analysis for a New Mixed Structure Building in Milan

Marco Zucca1, Nicola Longarini1, Federico de Socio2 and Iacopo Migliori2
  • 1 Politecnico di Milano, Italy
  • 2 E-Copla Engineering, Italy

Abstract

In this study the Construction Stage Analysis (CSA) of a new mixed structure building is discussed in order to identify the best timing and execution activities scheduling. The building is part of a new university campus that will be realized close to the center of the city. The CSA is carried out by the implementation of two models: the finite element model for the structural analyses and the BIM model for controlling the sequence of the construction phases. Once fixed the structural model, in the preliminary design phase, different sequences are analyzed in order to optimize the construction management in terms of timing and costs. Moreover, the optimization of the construction phases is set by considering the creep and shrinkage of the concrete material.

International Journal of Structural Glass and Advanced Materials Research
Volume 2 No. 1, 2018, 66-72

DOI: https://doi.org/10.3844/sgamrsp.2018.66.72

Submitted On: 30 January 2018 Published On: 6 March 2018

How to Cite: Zucca, M., Longarini, N., de Socio, F. & Migliori, I. (2018). Construction Stage Analysis for a New Mixed Structure Building in Milan. International Journal of Structural Glass and Advanced Materials Research, 2(1), 66-72. https://doi.org/10.3844/sgamrsp.2018.66.72

  • 5,703 Views
  • 3,152 Downloads
  • 1 Citations

Download

Keywords

  • BIM
  • Construction Management
  • Structural Analysis