Research Article Open Access

Profit Analysis of A Two Unit Cold Standby System with Preventive Maintenance and Random Change in Units

Khaled M. EL-Said and Mohamed S. EL-Sherbeny

Abstract

This study discusses the reliability of two units cold standby system with single repair. For achieving high reliability of the system, the operative and the standby units are interchanged at random epochs and additional preventive maintenance of operative and the standby units also. After the repair, the unit is sent for inspection to decide whether the repair is satisfactory. In case the repair is found unsatisfactory the unit is again sent for post repair. Using a regenerative point technique, various measures of system effectiveness are obtained.

Journal of Mathematics and Statistics
Volume 1 No. 1, 2005, 71-77

DOI: https://doi.org/10.3844/jmssp.2005.71.77

Published On: 31 March 2005

How to Cite: EL-Said, K. M. & EL-Sherbeny, M. S. (2005). Profit Analysis of A Two Unit Cold Standby System with Preventive Maintenance and Random Change in Units. Journal of Mathematics and Statistics, 1(1), 71-77. https://doi.org/10.3844/jmssp.2005.71.77

  • 3,356 Views
  • 2,527 Downloads
  • 19 Citations

Download

Keywords

  • Reliability
  • Random Change in Units
  • Preventive Maintenance
  • Post Repair
  • Inspection
  • Regenerative Point Technique
  • Regenerative Pont Technique